Currently, the firm provides Construction Engineering and Inspection services on FDOT projects.  The firm is qualified Unlimited with the FDOT for projects in categories 10.1, 10.3, 10.4 and 10.5.1.

PAST PROJECTS


 

Tampa Airport Interchanges Project, Tampa, Florida,   FDOT District 7
This FTBA Award Winning $233 million project involved the reconstruction of two major interchanges that facilitate the traffic movements for a majority of the traffic in the metropolitan Tampa area. 

 Role on Project:  Construction Engineering & Inspections (CEI) Services as a subconsultant to PB Americas

US 301 Widening, Parrish, Florida, FIN 427995-1-52-01 
This $6.9 million project on US 301 in Parrish, FL involved widening from two lanes to four lanes throughout the project limits, construction sidewalks at the back of the right-of-way, drainage improvements, miscellaneous structures, signing & pavement marking signalization and roadway lighting.
Role on Project:  Construction Engineering & Inspection (CEI) Services as the Prime Consultant to FDOT

I-75 from SR 82 to Luckett Rd., Ft. Myers, FL, FDOT District 1
This $7.64 million project consisted of widening of I-75 (SR 93) from an existing four-lane roadway to a six-lane roadway from south of SR 82 to Luckett Rd in Lee county, an approximate distance of 1.5 miles.  

Role on Project:  Inspection Services as a subconsultant to URS Construction Services



I-75 from Colonial to SR 82, Ft. Myers FL, FDOT District 1
This $7.79 milion design build lump sum project consisted of the widening of I-75 (SR 93) from an existing four-lane roadway to a six-lane roadway from south of Colonial Boulevard to SR 82 in Lee County, an approximate distance of 1.7 miles. 

Role on Project:  Inspection Services as a subconsultant to URS Construction Services

SR-54 ATMS Project, Pasco County, Florida, FDOT District 7
This $5.6 million Design/Build project involved the design, installation, integration and testing of ATMS field devices, a new dedicated fiber optic communications network, integration of components in the Traffic Management Center and installation of highway lighting.
Role on Project:  Contract Administration Services as a subconsultant to Dyer, Riddle, Mills & Precourt, Inc.



US-27 N. of Ritchie Road to S. of Barry Road, Polk County, Florida, FDOT District 1
This $14 million project consisted of widening US-27 from a four lane divided highway to a six lane divided highway, milling and resurfacing of the existing roadway, drainage improvements, improved signalization, lighting, installation of sound barrier walls, sidewalk construction, installation of five-foot paved bike lanes, and signing and pavement markings. 
Role on Project:  Inspection Services as a subconsultant to Dyer, Riddle, Mills & Precourt, Inc.


US-17 Widening, Zolfo Springs, Hardee County, Florida, FDOT District 1
This $17.1 million project consisted of widening US-17 from a two to four lane divided highway from south of CR 634 to 7th Avenue in the Town of Zolfo Springs.  Work included roadway widening, bridge replacement, storm drainage enhancement and relocation of water and sewer facilities. 
Role on Project:  Inspection Services as a subconsultant to URS Corporation

I-4/Selmon Expressway Connector, Tampa, Florida, FDOT District 7
This $389 million project involved construction of two major interchanges and elevated roadways between I-4 and the Selmon Expressway.  The project included the construction of an elevated toll plaza structure, 35 interchange and viaduct bridge structures, roadway construction including embankment, drainage structures and drainage pipe, MSE walls, road base, asphalt, roadway lighting, intersection signalization, ITS infrastructure and landscaping.
Role on Project:  Construction Engineering & Inspection (CEI) Services as a subconsultant to Cardno TBE

Design Build I-275 (Sunshine Skyway) Rest Areas and Seawall Repairs, in Manatee and Pinellas Counties, FIN 437635-1-52-01
This $18.5 million design-build project will encompass new buildings, improved parking and circulation roadways, sidewalks, storm water facilities, new sewer, LED lighting and separate lighting load centers for adjacent facilities.  Building construction at both Rest Area sites includes demolition of the existing Rest Area sites.
Role on Project:  Construction Engineering & Inspection (CEI) Services as the Prime Consultant to FDOT​​


Pedestrian/Wildlife Overpass over I-95, Fellsmere, Florida, FIN 432574-2-52-01

This $4.6 million contract consists of constructing a portion of the Central Railroad Corridor Greenway trail including installation of a prefabricated pedestrian bridge with architectural walls and towers, paving, curb and gutter, guardrail, detectable warnings, drainage improvements, fencing, sod, signing and pavement markings, ITS systems, fiber optic cable installation, and lighting along the former Trans Florida Central Railroad right-of-way.

Role on Project: Construction Engineering & Inspection (CEI) Services as the Prime Consultant to FDOT

CURRENT PROJECTS

SR 54 Widening Design-Build, Lutz, Florida, FIN 256339-2-52-01
This $15.8 million design-build project on SR 54 from east of the Suncoast Parkway to west of US 41 (SR 45) involved widening from four lanes to six lanes throughout the project limits, construction sidewalks at the back of the right-of-way, drainage improvements, miscellaneous structures, signing & pavement marking signalization and roadway lighting.  
Role on Project:  Construction Engineering & Inspection (CEI) Services as the Prime Consultant to FDOT

I-275 Design/Build Reconstruction Project, Tampa, Florida, FDOT District 7
This $215.4 million project consisted of the reconstruction of I-275 between SR 60 (Memorial Highway) and the Hillsborough River.  The improvements to I-275 included replacing the existing highway with four northbound through lanes from Westshore Boulevard to Himes Avenue, and four southbound through lanes from SR 60 (Memorial Highway) to the Hillsborough River.
Role on Project:  Construction Engineering & Inspection (CEI) Services as a subconsultant to Cardno TBE

SR 52 Widening Land O Lakes, Florida, FIN 256243-2-52-01
This $12.5 million project on SR 52 from east of Old Pasco Road to west of Bellamy Brothers Road involves widening from two lanes to four lanes throughout the project limits, construction of sidewalks and a shared use path, drainage improvements, miscellaneous structures, signing & pavement marking, signalization and roadway lighting.    
Role on Project:  Construction Engineering & Inspection (CEI) Services as the Prime Consultant to FDOT